“Based on the span lengths on the Wisconsin side of the project, concrete beams were an economical solution for the superstructure,” stated Terry Ward, P.E., MSISE, PMP, the Red Wing Bridge Construction Manager for the Minnesota Department of Transportation (MnDOT).
Read more about the U.S. 63 Red Wing Bridge project here.