CPL News

Building a Better Stay: The Efficiency of Prefabricated Solutions for Hotels

Written by Admin | Nov 8, 2024

Prefabricated Solutions for Hotels: Enhance Efficiency with Modular & Precast Components

Prefabricated solutions are on the rise in the construction industry because of their ability to accelerate construction schedules while offering long-lasting performance. The use of modular, prefabricated components in construction can shorten a project timeline by several months, leading to a much quicker return on investment for building owners. The hotel industry, in particular, has been an early adopter of this new technology, embracing solutions such as prefabricated hotel rooms along with precast concrete building systems.

Accelerating Hotel Construction with Precast Building Components

To achieve a faster return on investment, some hotel developers are turning to prefabricated hotel rooms, which are delivered to the construction site complete with indoor finishes, electrical, and plumbing. These components can be used alongside precast concrete building components such as precast elevator and stair shafts, hollowcore planks, and precast concrete columns and beams to shave even more time from the construction schedule. Precast building components are manufactured off-site and delivered to the project ready-to-install.

Faster Construction Schedules

Modular construction techniques are able to dramatically shorten a construction timeline because the components can be assembled while the site preparation and foundation construction are happening. The modular components are produced in climate-controlled, indoor facilities, eliminating weather delays. Installation is also less susceptible to weather delays than traditional construction methods, because cranes can continue to operate during rain, snow, humidity, and extreme temperatures.

Modular building components can be combined with traditional on-site construction techniques and still deliver significant time savings. For example, using a precast elevator shaft instead of a traditional masonry shaft can cut up to four weeks from a construction schedule. As soon as the foundation is ready, a precast elevator shaft can be installed in one or two days, depending on the height of the shaft. Once the shaft is in place, framing can begin immediately, as it would with a traditional masonry shaft.

Better Quality Control

When construction projects fall behind schedule due to weather delays or resource allocation challenges, maintaining consistent quality can become a challenge. With prefabricated components, production happens on a consistent, predictable schedule. Components undergo quality control testing and inspections during and after production. At County Prestress & Precast, our production facilities are certified by the National Precast Concrete Association and undergo thorough, unannounced third-party audits. We are committed to ensuring our products achieve industry standards for quality and performance.

Reduced Environmental Impact

The construction industry is a major source of non-industrial waste. Modular building components can help project leaders achieve sustainability goals by helping to reduce construction waste. Concrete is made from natural ingredients like sand, rock and cement which are abundantly available. In a factory setting, it is possible to rely on renewable energy sources and to minimize waste. Excess concrete materials can be recycled and reused in ways that are not feasible on the jobsite. 

Embrace the Advantages of Prefabricated Components for Hotel Construction

County Prestress & Precast manufactures precast concrete stair and elevator shafts, hollowcore plank, and precast columns and beams which can be used to accelerate the construction schedule of new hotels throughout the Northern Midwest and Southeast.  Our shafts are manufactured in an NPCA-certified environment to meet your project specifications and local building codes. Call our team at (708) 562-7700 or contact a sales representative to learn more.